Pilot Projects to test the
RINGtech®-Construction System


The aptitude of RINGtech®-products for hydro-construction has already been proven within the framework of pilot projects. The following uses were successfully completed:


Erosion prevention in tidal reaches
The laying of RINGtech®-mats

Foundation protection on a directional beacon in tidal reaches
The laying of a RINGtech®-mat

The protection of a groyne from wave overflow
Covering with a RINGtech®-mat

The construction of a connection dam between two islands
Installation and inter-connection of fillable RINGtech®-gabions

Bottom protection and scour prevention in front of a sheet piling
    Covering with a RINGtech®-mat which was tested under extreme propeller induced
currents duting berthing manoeuvres

 

All projects will be and were carried out in collaboration with hydro-construction companies, water and shipping authorities, as well as the Federal Institute for Hydro-construction.

 


 

Illustrated Pilot Projects

 

Copyright Unternehmer-Tun GmbH - All Rights Reserved